A Design of Four-Storey Noise Controlled Complex Building in Grand Central Terminal, Lucena City
Area of Research
Abstract
Monsour F. Bien, Alyssa Jane C. Hill, Sonny O. Mendoza, Albert Glenn E. Victa. “A Design of Four-Storey Noise Controlled Complex Building in Grand Central Terminal, Lucena City”, Unpublished Project Paper for the Degree of Bachelor of Science in Civil Engineering, College of Engineering and Technical Department, March 2015.
The project study is about the design of a Four-Storey Noise Controlled Complex
Building and has the following objectives: (a.) to design a four-storey noise controlled complex
building; (b.) to develop plan details and layout of the designed building; and (c.) to prepare
technical specifications, bill of materials, cost estimate and program of works of the designed
building.
The procedures followed by the researchers are as follows: (1.) Gathering data from
different sources like books, journals, related studies, internet, etc.; (2.) Site investigation for
finding the suitable location of the proposed project; (3.) Soil Analysis for finding the allowable
soil pressure and soil properties needed in the design computations; (4.) Evaluation of acoustical
materials to find the suitable materials for the purpose of the project which includes the analysis
of properties of common construction materials; and (5.) Design procedures presented on UNIT
IV of the manuscript including the design plan and drawings which is composed of the
Architectural Plan, Structural Plan, Electrical and Plumbing. The structural design computations
which are based on the NSCP 2010, Ultimate Strength Design (USD) Method, and National
Building Code of the Philippines (NBC). The preparation of cost estimate and Bill of Materials
by finding the quantity and type of materials and other services rendered for the construction of
the building. The preparation of program of works presented using the PERT/CPM diagram and
the preparation of technical specifications consulting the National Building Code of the
Philippines (NBC) and local rules and regulation of the City of Lucena which includes the
NOISE CONTROLLED COMPLEX BUILDING 13
technical specifications for the method of construction and the type of materials to be used for
the construction of the Noise Controlled Complex Building.
After collecting all the data needed in analyzing the structure, the Researchers found out
that the structural components of the building are well designed and can carry the loads subjected
to it and the materials used can reduce and regulate the noise inside the building.
From findings, common construction materials like fiberglass, dry wall or gypsum board,
glass, steel and mineral wool have their own acoustical properties that can help to regulate the
noise inside the building.
With this, the researchers highly recommend the construction of the Noise Controlled
Complex Building in Lucena City for future use of the community and future development of
studies related to noise control.
Keywords
complex building
noise-control
infoNotice
To view the full research, please contact our research department.
Browse our research
Areas of Research
APPLIED TECHNOLOGY, SCIENCE , INDUSTRYBUSINESS, ECONOMICS AND INDUSTRY 4.0 RESEARCHBUSINESS, INDUSTRY, LIVELIHOOD and FOOD SECURITYCOMMUNITY DEVELOPMENT and SOCIAL SUSTAINABILITYEDUCATION 4.0 AND WORKFORCE 4.0 RESEARCHEDUCATION and EDUCATION MANAGEMENTENVIRONMENTAL CONSERVATION, PROTECTION and DEVELOPMENTENVIRONMENTAL PROTECTION, DEVELOPMENT, AND CONSERVATION RESEARCHHEALTH and WELLNESS PROGRAM DEVELOPMENTHEALTH RESEARCH, DEVELOPMENT, INNOVATION AND EXTENSIONHUMANITIES, ARTS, CULTURE and TOURISMLEGAL, LAW ENFORCEMENT AND CRIMINOLOGY RESEARCHPOLITICS, SOCIETY, AND CULTURE RESEARCHTECHNOLOGY, ENGINEERING, AND INDUSTRY 4.0 RESEARCH